Monday, February 17, 2020

Current status of network management tools Assignment

Current status of network management tools - Assignment Example Essentially, it is important to have a network that is reliable in any organization in order to ensure continuous communication and connectivity. This can only be achieved by choosing the best and cost effective network management tools. Bandwidth monitor which is a tool that is used to provide a graphical representation of the real time traffic in a router or a switch. It is an exemplary tool for identification of bottlenecks that are related to the bandwidth within the network. It is used to monitor the percentage utilization of all the interfaces in the device and the average bandwidth per Second (Edward, 1994). Switch Port mapper which is a tool that is used by network engineers to identify the switch port to which a device is connected. This eliminates the need to manually trace the network cables. The tool basically discovers the devices that are plugged into each port of any particular switch in the network. It helps the system and network engineers to identify IP and MAC status and determine availability of ports. Since the tool operates on a real time discovery, it is also possible to view the operational status of each port (Sugauchi, Morisada, Hirata, Miyazaki, & Sato, 2002). The essay will technically discuss the IP Address Manager (IPAM) tool. This tool helps the network engineers to identify the availability of a network IP address in an enterprise network. The tool periodically scans a subnet and determines the IP address availability in that particular subnet. One can then determine whether a particular IP address is available or not. The tool is advantageous since it allows scanning of multiple subnets and helps to scan the entire network and get the status of IP addresses (Microsoft, 2014). This feature helps to identify whether the IP address belongs to a computer that is in an Active Directory. The feature is also used to view details of computer objects in an Active directory and subsequently synchronize

Monday, February 3, 2020

Project management plan Essay Example | Topics and Well Written Essays - 1750 words - 1

Project management plan - Essay Example After years of planning, effort and investment, a super cycle way route connecting Nottingham City to the Toton Rail station was conceptualized. This project will provide a safe, direct, paved, flat and continuous non-vehicular travel route between the station and the city. The route will feature several at-grade roads crossing in the entire length along an independent right-of-way in the road networks existing. The Greenway route surface will contrast according to suitability to the landscape, material availability and expected demand. A favored wearing course product currently promoted is a recycled material based on road planning and waste building aggregate. This forms an inert, grey material that rolls to provide a compact surfacing which seems to set if allowed to settle. It provides an even, all weather surfaces for cycles and wheelchairs or prams, whilst remaining softer than a bonded surface which can be stiff on walkers and horses joints. Where a route navigates an urban area it may be found desirable to arrange for a bitumen surface for maximum strength for high demand and to minimise maintenance. In this occurrence it might be considered necessary to provide an equivalent mown grass path for horse riders. Designs for the Greenway route construction will suggest for greater widths to accommodate varied options of shared use. Current specifications propose a 3metre wide path for a full multi-user path and a 2.5metre wide path where horse riders are barred. The path should sit, where space allows, in a wider corridor with a minimum 1 meter boundary either side or appropriate landscaping to the boundaries. The existing bridge is proposed to be redesigned and replaced with one that caters for both bicycle and pedestrian use. The new bridge will effectively connect the two locations without having to seek an alternative longer route. The new greenway route has